How to create new permt fast

 Plan will come like









After that wite equpmit tag like ABH003

In system wii come old one 
 From that you can get pefs and Others things 
But now that for RV or pump or s filter or what 
If you dont know how you isole go operater 

And Mark it like










In isoemetric drwaing you can get size of RV and flange 

Gensh make permit by cope by draft and he go to opearet with pefs to sgin ICC mechanical and electrical 

And still draft permit 

Opearet sgin icc  and will come wating for autorzation then on permit give to permit holer will come as live and that time you can upload vexhile entry and JHA job hse planbut before all those things sure there was site visit see size of RV and location and ti be insure the