T-9093   scope of Work

 

Unbolting Flange Joints:

1.       12” X 150# Flange Joints Unbolting – 6 no’s

2.       10” X 150# Flange Joints Unbolting – 3 no’s

3.       6” X 150# Flange Joints Unbolting – 4 no’s

4.       4” X 150# Flange Joints Unbolting – 4 no’s

5.       3” X 150# Flange Joints Unbolting – 2 no’s

6.       1” X 150# Flange Joints Unbolting – 3 no’s

7.       24” X 150# Flange Joints Unbolting(MH) – 3 no’s

8.       20” X 150# Flange Joints Unbolting(MH) – 1 no’s

9.       12” X 150# Flange Joints Unbolting (MH Vent) – 1 no’s

 

Existing Valve Remove Set aside:

1.       12” X 150# Existing valve Remove set aside – 2 no’s

2.       10” X 150# Existing valve Remove set aside – 1 no’s

3.       6” X 150# Existing valve Remove set aside – 2 no’s

4.       4” X 150# Existing valve Remove set aside – 2 no’s

5.       3” X 150# Existing valve Remove set aside – 1 no’s

6.       1” X 150# Existing valve Remove set aside – 2 no’s

 

Existing Pipe Spool Remove Set aside:

1.       12” X Sch 80 Existing Pipe Spool Remove set aside – 2.5 MTR

2.       10” X Sch 80 Existing Pipe Spool Remove set aside – 1 MTR

3.       6” X Sch 80 Existing Pipe Spool Remove set aside – 3 MTR

4.       4” X Sch 80 Existing Pipe Spool Remove set aside – 16 MTR

5.       3” X Sch 80 Existing Pipe Spool Remove set aside – 1.5 MTR

 

Install Blind:

1.       12” X 150# Install Blind – 2 no’s

2.       10” X 150# Install Blind – 2 no’s

3.       6” X 150# Install Blind – 4 no’s

4.       4” X 150# Install Blind – 2 no’s

5.       3” X 150# Install Blind – 2 no’s

6.       1” X 150# Install Blind – 2 no’s

 

 

Boxup & De-spading

Remove Blind:

1.       12” X 150# Remove Blind – 2 no’s

2.       10” X 150# Remove Blind – 2 no’s

3.       6” X 150# Remove Blind – 4 no’s

4.       4” X 150# Remove Blind – 2 no’s

5.       3” X 150# Remove Blind – 2 no’s

6.       1” X 150# Remove Blind – 2 no’s

  Pipe Spool Re-install:

1.       12” X Sch 80 Existing Pipe Spool Re-install – 2.5 MTR

2.       10” X Sch 80 Existing Pipe Spool Remove Re-install – 1 MTR

3.       6” X Sch 80 Existing Pipe Spool Remove Re-install – 3 MTR

4.       4” X Sch 80 Existing Pipe Spool Remove Re-install – 16 MTR

5.       3” X Sch 80 Existing Pipe Spool Remove Re-install – 1.5 MTR

Existing Valve Re-install:

1.       12” X 150# Existing valve Re-install – 2 no’s

2.       10” X 150# Existing valve Re-install – 1 no’s

3.       6” X 150# Existing valve Re-install – 2 no’s

4.       4” X 150# Existing valve Re-install – 2 no’s

5.       3” X 150# Existing valve Re-install – 1 no’s

6.       1” X 150# Existing valve Re-install – 2 no’s

Bolt-up Flange Joints:

1.       12” X 150# Flange Joints Bolt-up – 6 no’s

2.       10” X 150# Flange Joints Bolt-up – 3 no’s

3.       6” X 150# Flange Joints Bolt-up – 4 no’s

4.       4” X 150# Flange Joints Bolt-up – 4 no’s

5.       3” X 150# Flange Joints Bolt-up – 2 no’s

6.       1” X 150# Flange Joints Bolt-up – 3 no’s

7.       24” X 150# Flange Joints Bolt-up (MH) – 3 no’s

8.       20” X 150# Flange Joints Bolt-up (MH) – 1 no’s

9.       12” X 150# Flange Joints Bolt-up (MH Vent) – 1 no’s

 

 

 

 